Vallis Way
The Definitive Subdivision Plan for 109 Lowell St. - Vallis Way proposes to create 5 additional building lots by dividing the rear lot. The existing home at 109 Lowell Street will remain as is.
- Lynnfield Center Water District Ltr Final Comments and Water Permit 12/19/23
- Vallis Way Linden Response Ltr 12/18/23
- Vallis Way Retaining Wall Design Dated 8/16/23 Received 12/14/23
- Vallis Way Retaining Wall Construction Plan Dated 8/16/23 Received 12/14/23
- Hayes Response to Linden Comments 12/14/23
- Definitive Plan Minor Modification for Vallis Way (v2) 12/12/23
- Vallis Way National Grid Agreement 12/4/23
- Vallis Way Minor Modification Peer Review Report from Linden Engineering 11/29/23
- Minor Modification Letter from Hayes Engineering 11/20/23
- Updated Definitive Plan for Vallis Way 11/15/23
- Retaining Wall Easement Draft 11/22/22
- Supplemental Land Restrictive Easement Draft 11/22/22
- Drainage Infiltration and Temporary Easement 11/22/22
- Vallis Way Revised HOA 11/16/22
- Vallis Way Revised Plans 11/15/22
- Town Engineer Memo Response 11/2/22
- Vallis Way HOA Revised Agreement 11/1/22
- Vallis Way Lot 5 Conservation Restriction (draft) 10/26/22
- Vallis Way Mullen Drainage Memo 10/26/22
- Vallis Way Linden Peer Review 10/26/22
- Vallis Way Request for Continuance 10/26/22
- Vallis Way Sanborn Head GeoHydro Mounding Summary Memo 10/24/22
- Vallis Way Revised Definitive Plan 10/17/22
- Vallis Way Hayes Engineering Memo 10/17/22
- Vallis Way Request for Continuance 9/23/22
- Vallis Way Conservation Easement Proposed Map 6/17/22
- Vallis Way Conservation Easement Draft Agreement 6/17/22
- Revised Lotting Plan 5/5/22
- Vallis Tree Overlay Species Plan 4/25/22
- Vallis Tree Overlay Plan 4/20/22
- Updated Sketch Plan from Hayes Engineering 4/14/22
- Updated Red-Line from Plan Hayes Engineering 4/14/22
- Response Letter from Hayes Engineering 3/14/22
- Memo from Hayes Engineering - Groundwater Mounding 3/11/22
- CDM Hydraulic Analysis for Vallis Way 2/7/22
- Final Comment Letter from LCWD on Vallis Way 2/16/22
- Town Engineer Response to Comments 2/15/22
- Memo from Mullen 2/11/22
- Memo Dead End Street Length - 2/7/22
- Water Line Easement Memo Docs and Response - 2/7/22
- HOA Revision
- Peer Review Response Letter from Atty. John Kimball - 2/7/22
- Response from Hayes Engineering - 1/27/22
- Fire Department Updated Comments - 12/16/21
- Peer Review - 12/09/21
- Existing Tree Size/Species Plan
- HOA - 1st draft
- Response to Peer Review Stormwater
- LCWD Easement Conveyance
- LCWD Easement to Smith Farm Trail
- Revised Subdivision Plan - 11/30/21
- Hayes Definitive Plan Responses - December 2021
- Hydrant Flow Test Report - 11/30/21
- Existing Tree Plan - 11/04/21
- Revised Subdivision Plan - 7/28/21
- Supplemental Stormwater Calculations - 10/26/21
- Hayes Enginering memo - 7/27/21
- Linden Engineering Memo - 9/2/21
- Linden Engineering Memo - 7/17/21
- Definitive Subdivision Plan - 4/12/21
- Comment Letter from Jane Bandini
- Drainage Analysis
- Existing Watershed
- Operation and Maintenance Plan
- Comment Letter from Abutters Rich & Kris McCarthy
- Comment Letter from Abutter Julia & Robert Lowell
- Comment Letter from Abutters Gail & Peter Marcus
- Comment Letter from Abutters Steve & Christine Collins
- Fire Department Comment Letter - 05/20/2021
- Fire Department Ladder Truck Turning Radius
- BOH Comment Memo
- RMLD Comment Letter
- DPW Comment Memo
- Building Inspector Comment Memo
- LCWD Comment Letter
- LCWD Follow-up email response to 6-23-2021 letter